Fall River
49 units tracked across 10 developments — 14 already under construction, against 1,989 existing dwellings.
© Mapbox · © OpenStreetMap · 10 tracked developments
The pipeline
Helio analysis · cited · as of Nov 11, 2026
Fall River has 49 units tracked against 1,989 existing dwellings, a ratio of 2.5%. Among its five nearby comparables that is the thinnest share of the base: only Bedford, with 82 units on 3,116 existing dwellings, is close to it, and the other four carry larger shares. The units on file lean to proposals and small builds, not to committed volume.
Against its peers Each comparable with its own figures:
- North Dartmouth: 755 units, 1,819 existing dwellings, 10 projects
- Burnside: 245 units, 1,177 existing dwellings, 20 projects
- Lower Sackville: 1,193 units, 6,916 existing dwellings, 26 projects
- Wellington: 26 units, 549 existing dwellings, 3 projects
- Bedford: 82 units, 3,116 existing dwellings, 13 projects
- Fall River: 49 units tracked, 1,989 existing dwellings, 10 projects
Its base is the third largest of the six, behind Lower Sackville and Bedford, while its 49 units tracked rank fifth, ahead only of Wellington. It matches North Dartmouth on project count, 10 each, with about one-sixteenth of that area's units. The neighbours' figures carry no stage split, so their shares may rest on different mixes of proposals and approvals.
Pipeline vs the existing base The 2.5% is mostly potential and small-scale building. Of the 49 units, 28 are proposed, 7 are approved, 14 are under construction and none are recently completed. Half of the roster's ten projects carry no unit count on file, so the stage totals count units on file, not filings. The trailing 13 and 52 weeks each record no filings, approvals, permits, ground-breakings or completions, although the most recent tracked activity is dated 2026-11-06 and two projects under construction were updated in October 2026. The 7 approved units appear to be an older entitlement, last updated 2023-02-09. The declared building-permit value is $98,848,984 CAD; it is a declared figure, not struck construction, and the record does not itemise it.
What's leading Two proposals make up the 28 proposed units: Beaverbrook Dr with 20 (last updated 2025-12-12) and 115 Perrin Dr with 8 (2023-07-27). The 14 units under construction are Confederation Ave, 9 units in 2 storeys, and 21 McPherson Rd, 5 units in 3 storeys. The remaining entries are approvals or a proposal with no unit count on file: 3124 Highway 2, Fall River at PID 40165094, 2 Devonport Ave, 221 Aberdeen Dr, and Hunts Brook Rd. HRM's file for the Highway 2 application shows a development agreement with a public hearing scheduled for April 14, 2025 and a motion to approve at North West Community Council on 2025-05-12, which appears to be the application behind the 3124 Highway 2 entry [2]. On the ground, the physical work recorded is two small buildings, not a large site.
The character Fall River takes its name from a stream running between Miller Lake and Lake Thomas, and sits on the Shubenacadie Canal system; Highway 102 serves it at Exit 5 [1]. Halifax Transit's Fall River park and ride, off Highway 118 and Perrin Drive, serves the MetroX airport route [5]. Two larger provincial files sit outside the roster as listed: the province designated the Ingram Drive site a special planning area in February 2024 for about 120 units in three buildings, after HRM council had turned it down in 2022, and a court challenge was dismissed on timing grounds [3]. In July 2026 the provincial housing panel opened public input on a proposed housing development in a Fall River special planning area, with construction aimed to begin this fall [4]. The roster's ten entries do not identify either site by name. Water service is being extended along Fall River Road and Highway 2, and a drainage upgrade along Highway 2 is under federal and municipal agreement [6][7].
The read Against its neighbours, Fall River appears to be a quiet area with a small tracked share of a mid-sized base: 49 units on 1,989 dwellings, mostly proposals and two small builds, with no counted movement in 52 weeks. The provincial files for Ingram Drive and the July 2026 special planning area proposal suggest the larger activity here runs outside the municipal roster [3][4]. The question the record cannot answer is whether those sites are tracked under other names or not at all, and whether the 49 units would change if they were added; HRM's and the province's application files would show [3][4].
Sources
Not yet known
- Unit counts are not on file for five of the ten roster projects, so the stage totals leave them out.
- No published source was found for the Beaverbrook Dr proposal, the Confederation Ave and 21 McPherson Rd builds, or the Hunts Brook Rd and Devonport Ave entries.
- A census dwelling count for the community was found only on a reference mirror and conflicts with the 1,989 existing dwellings on record, so it is not used.
- The unit count and exact location of the proposal opened to public input in July 2026 were not confirmed in a primary source in the searches run.
- Zoning and what any parcel may hold are not assessed here; HRM's zoning records are the reference.
Zoning & what you can build
What your lot allows in Halifax Look up zoning at HRM (opens in a new tab)Planning regime: this area falls under the Planning Districts 14 & 17 plan area.
Read the Planning Districts 14 & 17 plan (HRM) (opens in a new tab)The largest developments
The biggest by unit count.
Common questions
What people ask about building in Fall River — answered from the data, regenerated daily.
How many units are under construction in Fall River?
14 units across 2 developments are under construction in Fall River — about 29% of the area's 49 tracked units.
How many developments are tracked in Fall River?
10 developments are tracked, totalling 49 units from proposal through completion, against 1,989 existing dwellings.
What is the largest development in Fall River?
Beaverbrook Dr, a 20-unit proposed development, followed by Confederation Ave (9 units) and 115 Perrin Dr (8 units).
Who tracks Fall River development data?
Helio Urban Development, a Halifax development company, synthesizes the pipeline from HRM building and development permits, planning and subdivision applications, and PVSC assessment.
Own a lot in Fall River?
Tell us where it is, and we will say whether we would build on it.
Nearby areas
How this is produced: HRM building and development permits, planning and subdivision applications, PVSC assessment and the tracked projects on the development map, regenerated daily. Last activity in this area: 2026-11-06. Method and limits are on the methodology page. Spotted an error? Correct a record. Reach Helio