East Dartmouth

1,995 units tracked across 88 developments — 756 already under construction, against 5,679 existing dwellings.

Loading the live pipeline… Open the live map
1,995
units tracked
38%
under construction
$158M
est. value, open permits

© Mapbox · © OpenStreetMap · 88 tracked developments

Fig. 01

The pipeline

Helio analysis · cited · as of Nov 11, 2026

East Dartmouth is second among the five Dartmouth areas on the record by units tracked, 1995, behind Downtown Dartmouth's 7770 and ahead of North Dartmouth's 755, Burnside's 245 and Forest Hills' 198. Set against its own 5679 existing dwellings, those 1995 units tracked are 35.1%, which reads as an area being re-shaped rather than built out, and one whose tracked stock is mostly physical already: 873 units completed and 756 under construction.

Against its peers

  • Downtown Dartmouth: 7770 units tracked on 16670 existing dwellings, 114 projects
  • East Dartmouth: 1995 units tracked on 5679 existing dwellings, 88 projects
  • North Dartmouth: 755 units tracked on 1819 existing dwellings, 10 projects
  • Burnside: 245 units tracked on 1177 existing dwellings, 20 projects
  • Forest Hills: 198 units tracked on 6786 existing dwellings, 9 projects

Downtown Dartmouth and North Dartmouth each carry a larger share of their own base than East Dartmouth's 35.1%; Burnside's share is smaller, and Forest Hills' 198 units sit on a larger base than East Dartmouth's, a far lighter load. East Dartmouth's 88 projects are second only to Downtown Dartmouth's 114 and well ahead of the 20, 10 and 9 projects in the other three areas, so its volume comes from many files rather than a few.

Pipeline vs the existing base The 35.1% is not potential alone. Of the 1995 units tracked, 255 are proposed and 111 approved, while 756 are under construction and 873 completed. The two physical stages together, 1629 units, outweigh the two paper stages, 366 units. The declared building-permit value in the active pipeline is $158,051,980 against an assessed base of $2,871,514,400.

What's leading Among the 12 largest projects, six are under construction, three completed, two proposed and one approved. The two largest are 57 Hamlet Lane, 238 units over 10 storeys, last updated 2025-12-09, and 149 Morado Lane, 208 units over 7 storeys, last updated 2026-11-06. The largest filing not yet approved is a 183-unit subdivision at PID 40173726, last updated 2026-01-14. On Opalridge Dr a 176-unit building at 189 is completed while a 12-storey, 120-unit building at 131 is under construction. On Main St a 105-unit project at 247 is approved and a 105-unit, 8-storey project at 155 is under construction. 77 Lakecrest Dr adds 104 units under construction. Hamlet Lane and 155 Main St carry last-updated dates of 2025-12-09 and 2025-09-11, so their recorded stage may trail the ground.

The character Morado Lane lies in the Penhorn Special Planning Area, where in October 2024 the province approved amendments to the development agreement for blocks off Morado Lane allowing taller buildings and smaller side yards [1]. The Penhorn and Woodlawn lands are described in an HRM planning document as one community of lakes, wetlands and parks, with neighbourhood names including Manor Park, Southdale and Evergreen Village [3]. Port Wallace, a separate special planning area in Dartmouth, has an approved development agreement of January 2023 and a stated capacity of up to 4,900 units [2]. The Woodside ferry runs weekdays only, and a notice dated 6 January 2026 reduced it to 30-minute service until further notice [4].

The read East Dartmouth is second among the Dartmouth areas by units tracked, 1995 against Downtown Dartmouth's 7770, and its tracked units equal 35.1% of its own base, with 873 completed and 756 under construction. Trailing 13 weeks show 6 filed, 1 approved, 1 broke ground and 5 completed, 28 units completed; the 52-week window shows the same 6 filings and 1 approval, with 10 completions and 57 units completed. All the filings of the year therefore fall in the last quarter, with latest activity on 2026-11-09. The question the record cannot answer is which sites those 6 filings are and how many of the 255 proposed units they supply. Matching HRM's planning application list for this area against the 88-project roster would settle which sites those are.

Not yet known

  • No web source found for 57 Hamlet Lane or the Opalridge Drive buildings; their description rests on the tracked record alone.
  • No source found stating whether the Port Wallace special planning area lies inside this area's boundary, and no roster entry names it.
  • Searches for Hamlet Lane returned only unrelated results, and none gave a developer name for any roster project.
756Under construction873Completed255Proposed111Approved

This quarter

5completed · 28 units6newly filed1approved1broke ground

Zoning & what you can build

What your lot allows in Halifax Look up zoning at HRM (opens in a new tab)

Planning regime: this area falls under the Dartmouth plan area.

Read the Dartmouth plan (HRM) (opens in a new tab)

Common questions

What people ask about building in East Dartmouth — answered from the data, regenerated daily.

How many units are under construction in East Dartmouth?

756 units across 16 developments are under construction in East Dartmouth — about 38% of the area's 1,995 tracked units.

How many developments are tracked in East Dartmouth?

88 developments are tracked, totalling 1,995 units from proposal through completion, against 5,679 existing dwellings.

What is the largest development in East Dartmouth?

57 Hamlet Lane, a 238-unit development under construction, followed by 149 Morado Lane (208 units) and a 183-unit proposed subdivision.

Where is development concentrated in East Dartmouth?

The streets with the most tracked developments in East Dartmouth are Noah Ave (25), Kassi Lane (13) and Morado Lane (10).

Who tracks East Dartmouth development data?

Helio Urban Development, a Halifax development company, synthesizes the pipeline from HRM building and development permits, planning and subdivision applications, and PVSC assessment.

How this is produced: HRM building and development permits, planning and subdivision applications, PVSC assessment and the tracked projects on the development map, regenerated daily. Last activity in this area: 2026-11-10. Method and limits are on the methodology page. Spotted an error? Correct a record. Reach Helio