The HR-1 zoning along Bedford Highway offers a practical way to build mid-rise housing, ranging from 4 to 12 storeys, with minimal parking requirements and promising rental returns. However, managing costs and timelines is critical. Developers face two main construction options:
- Standard Construction: Common but prone to budget overruns (30–60%) and delays (up to 18+ months). Costs are unpredictable, quality varies, and managing multiple contractors can be stressful.
- Integrated Design-Build (Helio): A streamlined approach with fixed pricing ($160,000/unit), guaranteed 6-month completion, and no cost overruns. It simplifies project management, ensures consistent quality, and includes a 2-year warranty.
For Bedford Highway projects where 2-bedroom units rent for $1,950–$2,100/month, the integrated method accelerates income generation and reduces risks, making it a strong choice for maximizing ROI.
Quick Comparison:
Factor | Standard Construction | Integrated Design-Build (Helio) |
---|---|---|
Cost Certainty | Budget overruns (30–60%) | Fixed price: $160,000/unit |
Timeline | 8–18+ months | 6 months (guaranteed) |
Quality Assurance | Varies; multiple contractors involved | 5 inspections, 2-year warranty |
Owner Experience | Complex coordination of multiple teams | Single point of contact, daily updates |
This comparison highlights why Helio’s integrated model is often the better option for Bedford Highway developments.
How Much Does It Cost To Build With Timber? Cost Management For Mid-rise Projects (Webinar)
1. Standard Construction
Building HR-1 mid-rise properties along Bedford Highway usually involves assembling a team of architects, engineers, general contractors, and subcontractors. While this approach is common, it often brings challenges that can affect the overall cost, timeline, quality, and the property owner's experience.
Cost Certainty
The standard construction process typically relies on cost-plus pricing. This means property owners cover the expenses for materials, labour, and contractor overhead, along with a markup. The downside? There’s no fixed price. Owners are left vulnerable to fluctuating material and labour costs, as well as unexpected changes during construction. These variables can quickly drive up expenses and make budgeting unpredictable. To make matters worse, this uncertainty often spills over into project timelines.
Timeline Efficiency
In this traditional setup, each phase of the project is handled sequentially. One professional must complete their part before the next can begin. While this sounds straightforward, any delay in one phase can create a domino effect, pushing back subsequent stages. This can stretch out the project timeline, delaying the property’s availability for the market.
Quality Assurance
With multiple parties involved, maintaining consistent quality can become a headache. Different teams may have varying standards and approaches, which complicates issue resolution. When quality concerns arise, coordinating among several professionals can take extra time and effort, slowing down the process even further.
Owner Experience
For property owners, managing multiple contracts and schedules can feel overwhelming. Juggling communications between various teams and making constant decisions adds to the stress. These common challenges in standard construction highlight the need to explore alternative methods that can streamline the process and address these recurring issues.
2. Integrated Design-Build (Helio Urban Development)
For HR-1 mid-rise projects along Bedford Highway, Helio Urban Development brings design, engineering, and construction teams together under one roof. This streamlined approach tackles the common challenges of traditional, fragmented construction head-on.
Cost Certainty
Helio provides fixed-price contracts at $160,000 per unit, which includes a complimentary $10,000 feasibility study. This setup ensures property owners know their costs upfront, avoiding the budget surprises that often derail traditional projects.
For those planning to use CMHC MLI Select financing, Helio offers units at $200,000 each, built to energy efficiency standards. These standards make it easier for property owners to qualify for 95% financing with just a 5% down payment.
Timeline Efficiency
Helio guarantees project completion within six months. By keeping all professionals aligned under one system, they prevent the delays that arise when teams work independently. Co-founder Yuan He, a data scientist from the University of Pennsylvania, employs advanced scheduling techniques to synchronize all trades seamlessly.
To back this commitment, Helio enforces strict penalties for delays. This means property owners can confidently plan to start collecting rent on time, with market rates for units along Bedford Highway ranging between $1,950 and $2,100 per month.
Quality Assurance
Helio doesn’t just save time and money - it ensures top-notch quality. With all teams working collaboratively, the company delivers premium finishes and carefully engineered details. A Professional Engineer conducts five inspections throughout the construction process, and property owners can choose the final inspector for added assurance.
To further build confidence, Helio provides a 2-year warranty on all construction work. This eliminates the blame-shifting that often arises when multiple contractors are involved in resolving issues.
Owner Experience
From start to finish, property owners deal with just one point of contact. Co-founder Lloyd Liu personally reviews every quote and guarantees the timelines, ensuring a smooth and transparent process.
Helio also keeps owners in the loop with daily photo updates via a real-time project portal. This level of transparency is a far cry from the often frustrating experience of chasing updates from multiple contractors in traditional setups.
Currently, Helio has 31 units under construction in Nova Scotia, with plans for 131 more. Serving property owners within 90 minutes of Halifax, their integrated approach has resulted in zero cost overruns on all completed projects. It’s a clear example of how integrated construction delivers predictable and successful outcomes for Bedford Highway developments.
sbb-itb-16b8a48
Pros and Cons
Traditional construction methods allow property owners to choose their own contractors, but this flexibility often comes with significant coordination challenges. For those considering HR-1 mid-rise projects along Bedford Highway, the decision between the traditional design-bid-build approach and Helio Urban Development's integrated design-build model reveals clear differences in cost control, timelines, quality, and overall project management.
Factor | Standard Construction | Integrated Design-Build (Helio) |
---|---|---|
Cost Certainty | Budget overruns of 30–60% are common due to fragmented coordination | Fixed price of CA$160,000 per unit with no additional costs |
Timeline Efficiency | Sequential processes can stretch an 8-month project to 18+ months | Guaranteed 6-month completion with penalties of up to CA$1,000 per day for delays |
Quality Assurance | Responsibility is divided among multiple contractors, complicating accountability | A Professional Engineer conducts five inspections, backed by a 2-year warranty |
Owner Experience | Managing independent teams creates oversight challenges | A single point of contact with daily photo updates simplifies management |
When viewed side by side, it's easy to see why Helio's streamlined model often outperforms the fragmented traditional approach.
The traditional design-bid-build method does offer flexibility. Owners can select individual professionals at each stage, potentially benefiting from competitive bids. However, this approach is fraught with risks, including miscommunication, delays, and cost overruns, all stemming from the lack of cohesive coordination.
On the other hand, Helio's integrated design-build model eliminates these pitfalls by bringing all necessary professionals under one roof. With an advanced scheduling system developed by co-founder Yuan He, delays are minimized, and project timelines are tightly managed. Co-founder Lloyd Liu further strengthens this model by personally guaranteeing project deadlines. This unified approach simplifies communication, speeds up decision-making, and delivers consistent, predictable outcomes.
For properties along Bedford Highway aiming for monthly rents between CA$1,950 and CA$2,100, Helio's guaranteed 6-month construction timeline is a game-changer. Completing projects faster not only accelerates rental income but also improves the overall return on investment by cutting down on financing costs and other time-related expenses. Additionally, while traditional methods often leave property owners dealing with multiple contractors for warranty issues, Helio ensures quality with coordinated inspections and a comprehensive warranty.
Ultimately, the best approach depends on your priorities. If choosing individual contractors is more important than maintaining predictability, the traditional route may appeal despite its challenges. However, if you value fixed costs, guaranteed timelines, and efficient project management, Helio's integrated design-build model offers a clear advantage in today’s competitive rental market.
Conclusion
The challenges of fragmented construction methods make it clear: an integrated approach is the way forward for the HR-1 mid-rise development along Bedford Highway. Traditional methods often lead to spiralling costs - up to 60% over budget - and lengthy timelines that stretch beyond 18 months. In contrast, the integrated design-build approach simplifies the process with fixed pricing and a guaranteed 6-month completion window. This not only speeds up market entry but also maximizes return on investment (ROI). By consolidating design, engineering, and construction under one roof, this method eliminates coordination headaches while ensuring single-point accountability, backed by firm timelines and comprehensive warranties.
The financial benefits are equally compelling. With local rental rates averaging CA$2,100 per month, delays in traditional construction can cost property owners roughly CA$8,800 in lost rental income every month. The integrated model’s 6-month guarantee allows owners to begin collecting rent a full year earlier, significantly boosting cash flow and reducing both financing costs and project-related stress.
Beyond simplifying the construction process, this approach accelerates time-to-market, a crucial advantage in Bedford Highway’s competitive rental market. With 31 units currently under construction and no cost overruns reported on completed projects, the integrated method has already demonstrated its success across Nova Scotia’s rental landscape.
For property owners aiming to secure predictable costs, fast occupancy, and efficient project management, the integrated approach stands out as the superior choice to maximize ROI and minimize risks in this high-demand market.
FAQs
What are the benefits of using the Integrated Design-Build (Helio) model for mid-rise rental projects on Bedford Highway?
The Integrated Design-Build (Helio) model simplifies construction by merging the design and building phases into one unified process. This approach helps avoid common issues like delays, unexpected costs, and disputes that can crop up with traditional methods. With a single team managing the entire project, property owners enjoy quicker timelines, smoother communication, and a more consistent delivery process.
Another key advantage of this model is the single point of accountability it offers. Instead of juggling multiple contracts and teams, the Helio model streamlines project management, keeping everything efficient and aligned with your objectives. For property owners aiming to make the most of their investment while navigating the challenges of Bedford Highway’s competitive rental market, this approach offers a practical and reliable solution.
How does the fixed-price and guaranteed-timeline approach of the Helio design-build model improve ROI for property owners?
The Helio design-build model offers a fixed-price and guaranteed-timeline approach, giving property owners cost certainty and shielding them from surprise expenses. This approach removes the financial unpredictability tied to shifting budgets and keeps projects aligned with their schedules.
By cutting down on delays, this method reduces holding costs and speeds up project completion, enabling owners to start earning rental income faster. Its streamlined communication and organized delivery process further reduce inefficiencies, creating a smoother workflow and making profitability more predictable.
How does Helio ensure top-quality construction and prevent delays during projects?
Helio places a strong emphasis on delivering top-notch work and staying efficient by enforcing rigorous quality control throughout the construction process. At every critical stage, Professional Engineers carry out five thorough inspections to ensure the work aligns with the highest standards.
To prevent setbacks, Helio relies on automation and advanced planning tools, including AI-driven processes, to manage timelines and costs with precision. This forward-thinking strategy keeps projects on track and provides a smooth, hassle-free experience for property owners.